>
> Lets set a date: 29 September?
>
> Well, I'll call for a partial hold right now. Please only commit bug
> fixes, minor cleanups, and features already on the roadmap for 3.1.
> The rest can be queued for commit post branch.
>
5 days to go and these bits left....
> * connection pinning
> I thinking it's been outstanding long enough we should get it into 3.1,
> even if we have to hold PRE1 a week after the branch to stabilize it (or
> test it in PRE1 ?).
>
Awaiting merge. (1-2 days).
> * kerberos helper
> Markus has supplied another set of code, I assume its been tested
> externally and just needs a drop-in.
>
Awaiting re-submission with some alterations. Non-blocker.
> * eCAP
>
Awaiting merge submission.
> * source layout
>
Started. Non-blocker.
> * source formatting
> scripts committed for use already, I was planning on starting the
> re-format and testbed run today here.
Now waiting on completion of other feature code.
Other misc stuff which qualifies but need some work if people have time:
Awaiting a verify:
http://www.squid-cache.org/bugs/show_bug.cgi?id=2433
Awaiting a verify test and debug:
http://www.squid-cache.org/bugs/show_bug.cgi?id=2393
Awaiting a developer:
* testbed level-02-maximus.opts
opposite of minimal. Everything enabled, leave configure to handle
clashes properly etc.
Amos
-- Please use Squid 2.7.STABLE4 or 3.0.STABLE9Received on Tue Sep 23 2008 - 14:16:40 MDT
This archive was generated by hypermail 2.2.0 : Wed Sep 24 2008 - 12:00:06 MDT